Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| building_w7:renovations [2019/04/03 03:41] – ↷ Page moved from renovations to building_w7:renovations admin | building_w7:renovations [2019/04/03 04:18] (current) – ↷ Links adapted because of a move operation admin | ||
|---|---|---|---|
| Line 9: | Line 9: | ||
| This is an exhaustive study led by Perry Dean Rogers & Partners about the feasibility of renovating the physical Baker House structure. | This is an exhaustive study led by Perry Dean Rogers & Partners about the feasibility of renovating the physical Baker House structure. | ||
| - | * {{1 - Introduction.pdf}} | + | * {{building_w7: |
| - | * {{2 - Design Evolution.pdf}} | + | * {{building_w7: |
| - | * {{3 - Wall Process.pdf}} | + | * {{building_w7: |
| - | * {{4 - Program.pdf}} | + | * {{building_w7: |
| - | * {{5 - Building Conditions Survey.pdf}} | + | * {{building_w7: |
| - | * {{6 - Proposed Scope & Schedule.pdf}} | + | * {{building_w7: |
| - | * {{7 - Sources.pdf}} | + | * {{building_w7: |
| - | * {{8 - Appendix.pdf}} | + | * {{building_w7: |
| --------------------------------- | --------------------------------- | ||